ISO New England OASIS

 

Transmission Service Offerings for the

Phase I/II HVDC-TF Intertie with Hydro-Québec

 - - -

The list of all Interconnection Rights Holders (IRH), including those that are Schedule 20A Service Providers, and their respective Phase I and Phase II Percentage Interest and Combined Percentage Interest MW share of the 2,000 MW Nominal Transfer Capability of the Phase II tie is provided in the table below.  The table is presented in three (3) sections: (A) the IRH that are Schedule 20A Service Providers offering service over the Phase I/II HVDC-TF pursuant to Schedule 20A to Section II of the ISO Tariff; (B) the IRH offering their share of the Phase I/II HVDC-TF through a Schedule 20A Service Provider listed in section (A); and (C) the IRH who are not currently offering their share of the Phase I/II HVDC-TF.  Clicking on the highlighted Schedule 20A Service Provider will bring you directly to their Transmission Provider Page on the ISO OASIS where an eligible customer can query and obtain Phase I/II HVDC-TF transmission services.

A customer wishing to move energy into or out of the New England Control Area over the Phase I/II HVDC-TF must acquire an advance reservation for transmission service over the facility by contacting a Schedule 20A Service Provider that is identified in section (A) of the table below, and include the OASIS reservation information in the submittal of Phase I/II HVDC-TF External Transaction to the ISO market system.

INTERCONNECTION RIGHTS HOLDERS* PERCENTAGE INTEREST & MW AS OF: SEPTEMBER 1, 2008

Interconnection Rights Holder

Phase I
Percentage
Interest

Phase II
Percentage
Interest

Combined
Percentage
Interest

Share of Tie (MWs)
(Combined Percentage
Interest of 2,000 MW,
Rounded DOWN)

(A)   IRH (Schedule 20A Service Providers) Offering Service over the Phase I/II HVDC-TF:

 

 

 

 

1.  Bangor Hydro-Electric Company

1.50834

1.52

1.51598

30

2.  Central Maine Power Company

6.99346

7.1205

7.07667

141

3.  Central Vermont Public Service Corporation (1a)

8.22198

10.2859

9.573847

191

4.  New England Power Company

21.9895

22.6158

22.39973

447

5. Northeast Utilities

34.21614

32.7734

33.27113

665

6.  NSTAR

14.97663

14.8873

14.91812

298

7.  The United Illuminating Company

5.44715

5.45

5.44902

108

8.  Vermont Electric Co-Op (2a)

1.16896

0.5188

0.74311

14

Subtotal (A) =

94.52216

95.1717

94.947607

1894

 

 

 

 

 

(B)    IRH Offering Service over the Phase I/II HVDC-TF through a Schedule 20A Service Provider (see Section (A) above):

 

 

 

 

1.  Fitchburg Gas and Electric Light Company (1b)

0.42636

0.4341

0.43143

8

2.  Green Mountain Power Corp. (1b)

2.93243

3.1792

3.09406

61

3.  UNITIL Power Corp. (1b)

0

1.227

0.80369

16

4.  Town of Braintree Electric Light Department (1c)

0.30879

0.3136

0.31194

6

5.  City of Burlington Electric Dept (2b)

0.72912

0

0.25155

5

 

 

 

 

 

(C)   IRH Not Offering Service over the Phase I/II HVDC-TF:

 

 

 

 

1.    City of Chicopee Municipal Lighting Plant

0.32263

0.32

0.32091

6

2.    Town of Concord Municipal Light Plant

0

0.1219

0.07984

1

3.    Connecticut Municipal Electric Energy Cooperative

0.82968

0.8448

0.83958

16

4.    Constellation Energy Commodities Grp

0.01565

0.016

0.01588

0

5.    Town of Danvers Electric Department

0.23892

0.2433

0.24179

4

6.    Town of Georgetown Municipal Light Department

0.02308

0.0235

0.02336

0

7.    Town of Hingham Municipal Lighting Plant

0.12007

0.1222

0.12147

2

8.    Town of Holden Municipal Light Department

0.07356

0.0749

0.07444

1

9.    City of Holyoke Gas & Electric Light Department

0.24775

0.2691

0.26173

5

10.  Hudson Light and Power Department

0.14765

0.15

0.14919

2

11.  Town of Littleton Electric Light & Water Dept.

0.0733

0.0747

0.07422

1

12.  Town of Mansfield Municipal Electric Department

0.16696

0.1701

0.16902

3

13.  Massachusetts Municipal Wholesale Electric Company

0.86138

0.8402

0.84751

16

14.  Town of Middleborough Gas and Electric Department

0.10638

0.1083

0.10764

2

15.  Town of Middleton Municipal Electric Department

0.04661

0.0474

0.04713

0

16.  Town of North Attleborough Electric Department

0.10838

0.1104

0.1097

2

17.  Pascoag Fire District - Electric Dept.

0.02285

0.0233

0.02314

0

18.  Town of Reading Municipal Light Department

0.46418

0.4726

0.4697

9

19.  Town of South Hadley Electric Light Department

0.1155

0.1176

0.11688

2

20.  Taunton Municipal Lighting Plant

0.3552

0.3608

0.35887

7

21.  Vermont Marble Company

0.10989

0

0.03791

0

22.  Vermont Public Power Supply Authority (3)

0.72438

0.0084

0.25541

5

23.  Town of West Boylston Municipal Lighting Plant

0.0508

0.0518

0.05146

1

24.  City of Westfield Gas & Electric Light Department

0.25304

0.257

0.25563

5

Subtotal (C) =

5.47784

4.8283

5.05241

90

Grand Total IRH [excluding Section (B), which are already reflected in Section (A)] =
(Percentages may not sum to 100% and MW total

may not sum to 2,000 MW due to rounding of values.)

100

100

100.000017

1984

 

Notes:

(1a)  Central Vermont Public Service (CVPS) Corporation includes service from other IRH in addition to its offering of its original Percentage Interest entitlement (original Percentage Interest: Phase I = 4.5544%; Phase II = 5.132%).  CVPS posts the aggregate Share of the Tie pursuant to the CVPS Schedule 20A under Part II of the ISO Tariff (for more information go to https://oasis.iso-ne.com/OASIS/CVPS and https://oasis.iso-ne.com/documents/CVPS/Brokering.html).

(1b)  This IRH’s Share of the Tie is offered through CVPS.

(1c)  This IRH’s Share of the Tie is offered through CVPS effective 09/01/08 - 5/31/2010.

(2a)  Vermont Electric Co-op (VECT) Percentage Interest entitlements include service from other IRH in addition to its offering of the Citizens Utilities Company original Percentage Interest entitlement (original Percentage Interest: Phase I = 0.43984%; Phase II = 0.5188%). VECT posts the aggregate Share of the Tie pursuant to the VECT Schedule 20A under Part II of the ISO Tariff (for more information go to https://oasis.iso-ne.com/OASIS/VECT).

(2b)  This IRH's share of the tie is offered through VECT.

(3)    Vermont Public Power Supply Authority (VPPSA) Percentage Interest entitlements include original Percentage Interest entitlements from Enosburg Falls (original Percentage Interest: Phase I = 0.03142%; Phase II = 0%), Hardwick (original Percentage Interest: Phase I = 0.0629%; Phase II = 0%), Ludlow (original Percentage Interest: Phase I = 0.05757%; Phase II = 0%), Lyndonville (original Percentage Interest: Phase I = 0.10768%; Phase II = 0%), Morrisville (original Percentage Interest: Phase I = 0.09811%; Phase II = 0%), Northfield (original Percentage Interest: Phase I = 0.05378%; Phase II = 0%), Princeton (original Percentage Interest: Phase I = 0.00823%; Phase II = 0%), Stowe (original Percentage Interest: Phase I = 0.09578%; Phase II = 0%), Swanton (original Percentage Interest: Phase I = 0.09219%; Phase II = 0%) and Washington Coop. (original Percentage Interest: Phase I = 0.11672%; Phase II = 0%).

 

Calculation of MW Share of the 2,000 MW Phase I/II HVDC-TF:

The values in the table above represent the current respective Percentage Interests in Phase I and Phase II of each IRH.  These values are reflective of the respective share of the costs of the Phase I and Phase II facilities that these IRH support, directly or indirectly, under the Phase I and Phase II Support Agreements.  The Combined Percentage Interest is derived in accordance with the following formula: {[(Phase I Percentage Interest x 690) + (Phase II Percentage Interest x 1,310)] / 2,000}.  The calculation of each IRH’s “Share of Tie” is based on their respective Combined Percentage Interest multiplied by the Phase II Nominal Transfer Capability of 2,000 MW, rounded down to whole MW.  [Note: If one were to sum the Percentage Interest values for all IRH listed in the table above, the totals would be greater than 100% because the Share of the Tie for IRH listed in section (B) of the table is also reflected in the Share of the Tie for the Schedule 20A Service Provider that offers service on behalf of the IRH listed in section (B) of the table.  For this reason, the IRH listed in section (B) of the table are excluded from the grand total above to avoid double-counting.] 


Revised September 1, 2008

ISO-NE OASIS Map

ISO-NE OASIS Map